Multiple Vertical Landings
30 July 2010
Flight 57 Includes Two Short Takeoffs And Vertical Landings
Marietta F-35 Subassembly Begins
27 July 2010
Center Wing Assembly Line To Reach Full-Rate In 2016
BF-4 Overhead
17 July 2010
Fourth F-35B At NAS Patuxent River, Maryland
Canadian Lightnings
16 July 2010
Canada Selects F-35A As Its Next Fighter
Lightning II Production Line
12 July 2010
F-35 Production Line Moves Beyond Test Jets
F-35A AF-3 First Flight
6 July 2010
Third F-35 Optimized CTOL Aircraft Flown
Navy F-35 Lightning II Completes Drop Testing
23 June 2010
F-35C Dropped With Full Load To Simulate Carrier Landings
F-35B Goes Supersonic
10 June 2010
F-35B Breaks Sound Barrier At Pax River
F-35A Structural Testing Completed
9 June 2010
F-35A Completes Static Testing Ahead Of Schedule